The GC should be out by Aug/Sep. Then my spouse and I have to go to work finishing things.Gorgeous! When’s it supposed to be done?
The GC should be out by Aug/Sep. Then my spouse and I have to go to work finishing things.Gorgeous! When’s it supposed to be done?
Just keep smoking! It'll show up soon!Windows! But still no patio floor.
View attachment 293123
Please tell us more about how to deploy this strategy Was she a smoker already?No worries, man! I know the option of "get your spouse to become a pipe smoker also" is not available to everyone, so I'm happy to hear about other strategies, too.
Thanks for the updates; it's been really fun to follow how things have progressed. I enjoy watching some of those home reno shows but sadly no one's done one with a pipe room as part of the work.View attachment 309494
They started siding around the garage, which is the other side of our breezeway here. Behind me you can just make out the old walnut tree we used to find shade and cool breezes under in high summer whose location and orientation drove the design of this outdoor space.
The plasterer is just about done inside, so I can take measurements for the pipe and tobacco cabinet that will live just inside from this porch.
Wow, that sounds like some pretty memorable stuff.Yeah, they get really bland people to do those shows. I did about 7-8 years of installation work as part of my 20 years as a cabinet and furniture maker and I have had many conversations with folks about building displays or structures to show off their eccentric hobbies. Everything from model railroads to fully equipped BDSM dungeons.
A 2' wide pipe rack built-in ain't nothing.